Towpath south of Railway Bridge, Hempole Lane, Tipton, Walsall Canal
Detail
From Date: 01/05/2024 08:00
To Date: 08/05/2024 17:00 inclusive
Type: Advice
Reason: 3rd Party Works
Is the towpath closed? No
Location
Closest waterway: Walsall Canal
Starts at: Railway Bridge, Hempole Lane
Ends at: Lock 8, Ryders Green Bottom Lock
Description
Third party contractors are resurfacing the towpath south of Railway Bridge, Hempole Lane. The towpath will remain open and pedestrian marshals will be on site to direct traffic. Once one side of the canal towpath is resurfaced, pedestrians will be directed onto that and the task will be repeated to reinstate the other half width of the towpath.
Works will take place from 01/05/24 to 08/05/24